This mud is often mixed with bentonite or other compounds depending on ground conditions. The thickness of the mud must be greater than the thickness of water to allow for it to carry the cuttings back out of the bore hole. This is something that inexperienced utility contractor Tulsa often overlook which can lead to extremely expensive situations.

This is another area where the beacon is sending critical data back to the operator and Locator on the fluid pressures inside of the bore hole. If the flow of mud or cuttings is blocked or partially blocked pressures will begin to grow inside of the bore hole. These pressures will build slowly at first and then exponentially as the blockage increases and the pressure is compounded. Eventually that pressure will find the easiest way out. Since horizontal directional drilling is typically carried out in areas where excavation is not ideal for example underneath a street or parking lot or river or building, a frack out can be a very bad situation. Is that hydraulic pressure builds inside the borehole the fluids and mud will eventually see you get out the easiest route out. It does not take a tremendous amount of pressure inside of a bore hole to push up an interstate so that it becomes a dangerous if not deadly change In the paving surface or to create a blister under a parking lot that extends for several tens if not hundreds of feet in diameter or on a golf course which arranged eventually it wrapped in a volcano like action of bore mud. The newest and highest tech locating equipment have the ability to monitor borehole pressures and send that vital data back to the operator and Locator of your utility contractor Tulsa so that a change can be made before the situation becomes worse.

As mentioned above, the bacon also sends back other vital information to the locator receiver and the remote which is on the drill machine. This information can include but is not limited to pitch up or down, position on the clock, temperature, depth, and also some other features such as offset locating and forward and back locating. Pitch can be especially important because it tells the drill locator if the drill string is getting deeper or shallower. If the slope of existing grade is falling the drill Locator must maintain a negative pitch equal to the pitch on the ground to maintain a specific depth and vice versa when going uphill. This is crucial when objects needed to be avoided by going deeper or shallower. Next, position on the clock. As discussed, earlier position on the clock till is the drill Locator and drill operator what position the drill paddle is at the current time. This is extremely important as it is used to steer the drill string in any given direction by pushing. It can be easily explained by something we all did as kids. When going down the highway in a vehicle with the window down you put your hand out of the window if you pull your fingers up or 12 o’clock your hand goes up if you point your fingers down or 6 o’clock your fingers while your hand will go down in the same works in any given direction. This is the same principle used when pushing a drill string through the ground to steer. Other vital information sent back to the utility contractor locator and then on to the receiver is the temperature of the beacon as discussed previously temperatures can reach very high levels if fluid is lost or certain underground conditions are in countered. The Beacon which typically cost utility contractor Tulsa around five to $6000 cannot stand temperatures of more than approximately 160°. This is why is extremely important to monitor the temperature of the bore head and begin to avoid costly mistakes from an overhead sign. The last bit of information sent back to the drill Locator and onto the remote is the depth. Obviously, this is a very important piece of data as well as it tells the operator how far below ground the drill head is located. The newest utility locating systems and HDD locating systems can cost between 25 and 30 and higher into 40 and $50,000. This is an investment that a quality utility contractor Tulsa has made without question to ensure the highest probability of successfully completed directional bores. If your utility Tulsa is not utilizing the highest tech most recent locating system, they are cutting corners and you should ask more questions as their customer.

This is been a very on the surface explanation of how bore or horizontal directional drill locating systems operate. Talk to your contractor Tulsa about the type of equipment they are using and what precautions and data they are receiving when completing horizontal directional drill projects for you or your customer. The difference and information and accuracy and information that you are utility contractor Tulsa is receiving from their utility locating equipment and HDD equipment can be the difference between a successful bore and a damaged existing utility or at the very least A less productivecontractor Tulsa. If you or someone you know is looking for an experienced utility contractor, a utility contractor Tulsa has depended on for nearly 40 years for successful excavation horizontal directional drilling and aerial utility construction services, please reach out to GEI Utility Construction today to see what we can do for you. As always, we guaranteed to beat any competitor’s price by at least 15% and to return a free no hassle, no obligation quote within 24 hours. What have you got to lose? Give GEI Utility Construction a call today to see the Gable’s difference. Thank you for visiting our website and for considering GEI Utility construction for your utility construction needs, we truly appreciate it and are looking forward to the opportunity of working together in the future!